Sizing captive power when the grid is a guess

Most commercial generators in Nigeria run at under 40% load. That is expensive. A week of logging usually tells you why.

G ATS GEN-01 · 500 kVA · 0.8 PFPV ARRAY · 120 kWpBESSLV BUS CAPTIVE POWER · SLDFPZ / 4.0 · SHEET 03REV A

A generator running at 30% load burns more fuel per kilowatt-hour, wets its exhaust and wears faster than one running at 70%. Yet oversizing is the norm. Nobody wants to be blamed for a set that trips when the lifts and chillers start together.

Measure before you buy

An energy audit starts with logging. We clip meters onto the main incomer and key sub-circuits for a week, then build a load profile: base load, daily peaks, motor starts and the hours when almost nothing is running.

That profile usually reveals three things. The peak is lower than everyone assumed. The night load is tiny. And a handful of large motors cause most of the starting surges.

Design the mix

With real numbers, the options get clearer. Soft starters can tame surges. A battery bank can carry the night load so the generator can shut down. Solar can shave daytime peaks. Sometimes the answer is two smaller sets synchronised, so one can rest.

The result is not just lower diesel use. It is fewer breakdowns, cleaner maintenance records and a power cost you can actually forecast.

Next step

Got a tender, a failing asset or a growth target?

Send the brief as it is. Half-finished specs are fine. We will help you tighten it.

Field notes ¡¤ monthly

Don't miss a thing

Subscribe to get exclusive offers, early access to new releases, and expert advice.